Thursday, March 16, 2023
Thursday, February 18, 2021
VoLTE Procedure Variations and Concepts storyboard - ppt download
VoLTE Procedure Variations and Concepts storyboard - ppt download: Emergency calling (VoLTE) Course objective Differentiate between a VoLTE-to-VoLTE call procedure and the following procedures, including the IMS Network Elements required to support each call case: Roaming SRVCC and eSRVCC Border Control Call Continuity VoWiFi Emergency calling (VoLTE) Emergency calling (VoWiFi) IMS Messaging Title: Course Objective On our X minutes journey today we will explore the VoLTE related topics shown. Storyline: Time will be added once final WBT is generated and clocked.
Wednesday, January 27, 2021
Monday, January 25, 2021
Saturday, October 10, 2020
5GSA - AMF Pool Concepts - Part 1
#5GSA - #5GC Implementation requires some extra cautious approach if the aim is to introduce a new set of capabilities for DSP ambition.
Even though #AMF Pool concept looks like as usual Control Plane #NF Pool function, some dependencies on capability and some innovative solutions need to be brought together to achieve a smooth #5G Network experience.
We cannot afford to run the network with the usual "engineering/technology gaps" we used to have in existing / past technologies. ;-)
I will share some thoughts based on past experiences with major vendors, how to tackle this.
#5gnr #5g #4g #5gnr #volte #5gc #5gtechnology #5gnetwork #lte #5gnetworks #5GC #strategy
Even though #AMF Pool concept looks like as usual Control Plane #NF Pool function, some dependencies on capability and some innovative solutions need to be brought together to achieve a smooth #5G Network experience.
We cannot afford to run the network with the usual "engineering/technology gaps" we used to have in existing / past technologies. ;-)
I will share some thoughts based on past experiences with major vendors, how to tackle this.
#5gnr #5g #4g #5gnr #volte #5gc #5gtechnology #5gnetwork #lte #5gnetworks #5GC #strategy
Friday, October 9, 2020
Monday, October 5, 2020
Subscribe to:
Posts (Atom)
-
ACC & Class-15 SIM cards Continued here : Part-2 LTE L3 SIB 2 Message f...
-
As we can see in the above diagram, aprt from transport technology migration from TDM to "All-IP" LTE/4G architecture retain...
-
#5GSA - #5GC Implementation requires some extra cautious approach if the aim is to introduce a new set of...